Skip to main content
  • Home
  • Hello Geoffrey Makstutis
  • Log out

Administrative toolbar

  • Dashboard (View and customize your dashboard.)
  • Content (Administer content and comments.)
  • Structure (Administer blocks, content types, menus, etc.)
  • Appearance (Select and configure your themes.)
  • People (Manage user accounts, roles, and permissions.)
  • Modules (Extend site functionality.)
  • Configuration (Administer settings.)
  • Reports (View reports, updates, and errors.)
  • Help (Reference for usage, configuration, and modules.)
Hide shortcuts
  • Add content
  • Find content
  • Views
  • Taxonomy
  • Pages
  • Tab Tamer
Edit shortcuts

Main menu

  • List links
  • Edit menu
  • Configure block
  • Home
  • Developments
COBie Edition logo

COBie Edition

  • View(active tab)
  • Development
  • Edit
  • Menus
  • Log
  • Devel

You are here

  1. Home
  2. » Developments

Vertical Tabs

Instruction

Development Test 1

Submitted by Geoffrey Makstutis on Mon, 2012-05-21 15:05

  • Edit view
Status Release Version Region
Development Test 1 IFC2x3 1.00 1.00 en-UK
  • Edit view

All Phases

Count Key Contents
2 Contacts per Object People and Companies

Outline

  • Edit view
Count Key Contents
365 Additional information per Object Individual worksheets are organized by project phase as shown below

Early Design Worksheets

  • Edit view
Count Type Key Contents
1 Facility
1 Floor Floors per Facility Vertical levels and exterior areas
3 Space Spaces per Floor Spaces
19 Type Components per Type Types of equipment, products, and materials
1 Zone Spaces per Zone Sets of spaces sharing a specific attribute

Detailed Design Worksheets

  • Edit view
Count Type Key Contents
6 Assembly Assemblies per Object Constituents for Types, Components and others
35 Component Components per Space Individually named or schedule items
4 Connection Connections per Object Logical connections between components
28 Impact Impacts per Object Economic, Environmental and Social Impacts at various stages in the life cycle
5 System Components per System Sets of components providing a service

Operations and Maintenance

  • Edit view
Count Type Key Contents
12 Job Jobs per Type PM, Safety, and other job plans
1 Resource Resources per Type Required materials, tools, and training
15 Spare Spares per Type Spares per Type

All Phases

  • Edit view
Count Type Key Contents
129 Attributes Attributes per Object Properties of referenced item
87 Coordinate Coordinates per Object Spatial locations in box, line, or point format
14 Document Documents per Object All applicable document references
4 Issue Issues per Object Other issues remaining at handover.

Add new comment

Geoffrey Makstutis

More information about text formats

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

Full HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.

PHP code

  • You may post PHP code. You should include <?php ?> tags.

Display Suite code

  • You may post Display Suite code. You should include <?php ?> tags when using PHP. The $entity object is available.
Facility
  • Edit view
Title Created By Created On Status
StandardCell jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Floor
  • Edit view
Title Created By Created On Status
Level 0 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Space
  • Edit view
Title Created By Created On Status
L0-01A jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
L0-02B jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
L0-C01 nn@aec3.com 2012-01-20T10:01:14 Complete 
Type
  • Edit view
Title Created By Created On Status
Wallgate ALS180 Basin 470w x 300d nn@aec3.com 2012-01-20T10:01:14 In-Progress 
WC Pan 510 x 510mm nn@aec3.com 2012-01-20T10:01:14 Complete 
Plumbing SVP 1 nn@aec3.com 2012-01-20T10:01:14 Complete 
Mirror nn@aec3.com 2012-01-20T10:01:14 Complete 
TFT Monitor nn@aec3.com 2012-01-20T10:01:14 Complete 
Material Brickwork jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Generic Inserts jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Generic jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Concrete (Painted) jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 340mm 2 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 150mm jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
1275x1200h jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Safer Seat jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Cell Locker jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Desk Whitewood jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Cell Bed family jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
790 x 2110mm 3 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
1810 x 2110mm jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Zone
  • Edit view
Title Created By Created On Status
Secure nn@aec3.com 2012-01-20T10:13:26 In-Progress 
Assembly
  • Edit view
Title Created By Created On Status
Basic Wall:Generic Ext - 150mm layer 01 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm layer 01 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 340mm 2 layer 01 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 340mm 2 layer 02 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 340mm 2 layer 03 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 340mm 2 layer 04 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Component
  • Edit view
Title Created By Created On Status
TFT Monitor:TFT Monitor:TFT Monitor:211812 nn@aec3.com 2012-02-14T16:26:46 In-Progress 
Cell Locker:Cell Locker:Cell Locker:211806 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211792 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211793 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211794 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211795 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211796 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211797 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 80mm:211799 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 80mm:211800 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 80mm:211801 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 80mm:211802 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 340mm 2:211809 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211829 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211830 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Safer Cell 7 Bay FF:1275x1200h:1275x1200h:211810 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Cell Desk:Desk Whitewood:Desk Whitewood:211805 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Cell Bed family:Cell Bed family:Cell Bed family:211804 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Safer Seat:Safer Seat:Safer Seat:211803 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Mirror:Mirror:Mirror:211825 nn@aec3.com 2012-02-14T16:26:46 In-Progress 

Pages

  • 1
  • 2
  • next ›
  • last »
Connection
  • Edit view
Title Created By Created On Status
Cell 1 outflow nn@aec3.com 2012-02-15T16:23:24 Complete 
Cell 1 drain nn@aec3.com 2012-02-15T16:23:24 In-Progress 
Cell 2 outflow nn@aec3.com 2012-02-15T16:23:24 In-Progress 
Cell 2 drain nn@aec3.com 2012-02-15T16:23:24 In-Progress 
Impact
  • Edit view
Title Created By Created On Status
1275x1200h Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Plumbing SVP 1 Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Safer Seat Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
StandardCell Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
TFT Monitor Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
TFT Monitor PrimaryEnergyConsumption of use nn@aec3.com 2012-01-20T10:01:14 Complete 
Wallgate ALS180 Basin 470w x 300d Cost of maintenance nn@aec3.com 2012-01-20T10:01:14 Complete 
Wallgate ALS180 Basin 470w x 300d Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Wallgate ALS180 Basin 470w x 300d Cost of replacement nn@aec3.com 2012-01-20T10:01:14 Complete 
WC Pan 510 x 510mm Cost of maintenance nn@aec3.com 2012-01-20T10:01:14 Complete 
WC Pan 510 x 510mm Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
WC Pan 510 x 510mm Cost of replacement nn@aec3.com 2012-01-20T10:01:14 Complete 
Wallgate ALS180 Basin 470w x 300d Embedded carbon nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Mirror PrimaryEnergyConsumption of use nn@aec3.com 2012-01-20T10:01:14 Complete 
Mirror Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
1810 x 2110mm Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
790 x 2110mm 3 Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Basic Wall:Generic Ext - 150mm Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Basic Wall:Generic Ext - 340mm 2 Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Basic Wall:Generic Ext - 80mm Cost of production nn@aec3.com 2012-01-20T10:01:14 In-Progress 

Pages

  • 1
  • 2
  • next ›
  • last »
System
  • Edit view
Title Created By Created On Status
Circuit 1 jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Internal fabric 1 nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Plumbing 1 nn@aec3.com 2012-01-20T10:01:14 In-Progress 
FFE nn@aec3.com 2012-01-20T10:01:14 In-Progress 
External envelope 1 nn@aec3.com 2012-01-20T10:01:14 In-Progress 
Job
  • Edit view
Title Created By Created On Status
Wallgate ALS180 Basin 470w x 300d Maintenance Schedule nn@aec3.com 2012-01-20T10:01:14 Complete 
WC Pan 510 x 510mm Maintenance Schedule nn@aec3.com 2012-01-20T10:01:14 Complete 
Plumbing SVP 1 Maintenance Schedule nn@aec3.com 2012-01-20T10:01:14 Complete 
Mirror Maintenance Schedule nn@aec3.com 2012-01-20T10:01:14 Complete 
TFT Monitor Maintenance Schedule nn@aec3.com 2012-01-20T10:01:14 Complete 
1275x1200h Maintenance Schedule jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Safer Seat Maintenance Schedule jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Cell Locker Maintenance Schedule jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Desk Whitewood Maintenance Schedule jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Cell Bed family Maintenance Schedule jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
790 x 2110mm 3 Maintenance Schedule jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
1810 x 2110mm Maintenance Schedule jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Resource
  • Edit view
Title Created By Created On Status
Wallgate ALS180 Basin DL7523 nn@aec3.com 2012-02-14T16:26:46 Complete 
Spare
  • Edit view
Title Created By Created On Status
1810 x 2110mm Replacement Parts List Complete 
Wallgate ALS180 Basin WF4002 Complete 
Wallgate ALS180 Basin RW9602 Complete 
Wallgate ALS180 Basin WN4001 Complete 
WC Pan 510 x 510mm Replacement Parts List Complete 
Plumbing SVP 1 Replacement Parts List Complete 
Mirror Replacement Parts List Complete 
TFT Monitor Replacement Parts List Complete 
1275x1200h Replacement Parts List Complete 
Safer Seat Replacement Parts List Complete 
Cell Locker Replacement Parts List Complete 
Desk Whitewood Replacement Parts List Complete 
Cell Bed family Replacement Parts List Complete 
790 x 2110mm 3 Replacement Parts List Complete 
Wallgate ALS180 Basin RW9611 Complete 
Attribute
  • Edit view
Title Created By Created On Status
TOID James.Brayshaw@ordnancesurvey.co.uk 2012-02-15T16:03:03 In-Progress 
UPRN James.Brayshaw@ordnancesurvey.co.uk 2012-02-15T16:03:03 Complete 
YearOfLastRefurbishment nn@buildingSMART.org.uk 2012-02-15T13:39:00 Complete 
YearOfConstruction nn@buildingSMART.org.uk 2012-02-15T13:39:00 Complete 
WashHandBasinType nn@buildingSMART.org.uk 2012-02-11T18:31:28 Complete 
WallCovering nn@buildingSMART.org.uk 2012-02-15T13:39:00 Complete 
Water Supply pressure nn@aec3.com 2012-02-11T18:31:28 Complete 
Width jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Wrapping at Ends jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Wrapping at Inserts jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
URL jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Type Comments jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Type Mark jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Unconnected Height jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Utilisation nn@aec3.com 2012-01-24T08:59:23 Complete 
Volume jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
SpilloverLevel nn@buildingSMART.org.uk 2012-02-11T18:30:04 Complete 
SiteAddress nn@buildingSMART.org.uk 2012-01-19T12:27:24 Complete 
Sill Height jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Sill Finish jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • next ›
  • last »
Coordinate
  • Edit view
Title Created By Created On Status
Basic Wall:Generic Ext - 150mm:211794 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211829 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 340mm 2:211809 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 340mm 2:211809 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 80mm:211802 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm:211802 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm:211801 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm:211801 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm:211800 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm:211800 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm:211799 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 80mm:211799 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Basic Wall:Generic Ext - 150mm:211797 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211797 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211796 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211796 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211795 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211795 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211829 box-upperright jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 
Basic Wall:Generic Ext - 150mm:211830 box-lowerleft jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 In-Progress 

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • next ›
  • last »
Document
  • Edit view
Title Created By Created On Status
1810 x 2110mm Product Data jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
WC Pan 510 x 510mm Installation nn@aec3.com 2012-02-14T14:19:32 Complete 
WC Pan 510 x 510mm Product Manual nn@aec3.com 2012-02-14T14:19:32 Complete 
WC Pan 510 x 510mm Product Data nn@aec3.com 2012-02-14T14:19:32 Complete 
Wallgate ALS180 Basin 470w x 300d Installation nn@aec3.com 2012-02-14T14:19:32 Complete 
Wallgate ALS180 Basin 470w x 300d Product Manual nn@aec3.com 2012-02-14T14:19:32 Complete 
Wallgate ALS180 Basin 470w x 300d Product Data nn@aec3.com 2012-02-14T14:19:32 Complete 
1275x1200h Product Data jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Safer Seat Product Data jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Cell Locker Product Data jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Desk Whitewood Product Data jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
Cell Bed family Product Data jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
790 x 2110mm 3 Product Data jjohnston@brydenwood.co.uk 2012-01-19T12:27:24 Complete 
COBie requirements nn@aec3.com 2012-02-14T14:19:32 Complete 
Issue
  • Edit view
Title Created By Created On Status
Missing data 1 nn@aec3.com 2012-02-15T16:16:12 In-Progress 
Missing data 2 nn@aec3.com 2012-02-15T16:16:12 In-Progress 
Missing data 3 nn@aec3.com 2012-02-15T16:16:12 In-Progress 
Product substitution nn@aec3.com 2012-02-15T16:16:12 In-Progress 
  • Edit Panel

Navigation

  • List links
  • Edit menu
  • Configure block
  • Add content
  • Build RDF index
  • Import
  • Import core RDF vocabularies
  • Import external RDF vocabulary
  • SPARQL endpoint