|
FullviewCalendar With Repeating Smart Date Events Causing Significant Load Times |
Closed (won't fix) |
Normal |
Bug report |
5.1.5 |
Code |
|
4 years 3 weeks |
|
Date Recur 3.x and Fullcalendar View 5.x |
Needs review |
Normal |
Feature request |
5.x-dev |
Code |
|
4 years 9 months |
|
Mink dragTo() Not working with Gitlab CI |
Closed (fixed) |
Normal |
Task |
5.3.x-dev |
Code |
mingsong |
8 months 4 weeks |
|
Time Format Setting causes Timezone of event offset problem |
Closed (fixed) |
Major |
Bug report |
5.3.x-dev |
Code |
karing |
4 years 11 months |
|
Event colors based on boolean field |
Needs review |
Normal |
Feature request |
5.x-dev |
Miscellaneous |
|
4 months 2 weeks |
|
Add ability to adjust buttonText |
Active |
Normal |
Feature request |
5.x-dev |
Code |
|
2 years 7 months |
|
JS problem with token fields |
Closed (works as designed) |
Normal |
Feature request |
5.2.5 |
Code |
ubriqui |
7 months 6 days |
|
Update to Fullcalendar library v6 |
Needs review |
Normal |
Task |
6.x-dev |
Code |
|
2 years 7 months |
|
Hide version number |
Closed (works as designed) |
Minor |
Task |
5.3.x-dev |
Code |
|
7 months 2 weeks |
|
Calendar view refreshes and jumps to current month on any ajax update |
Patch (to be ported) |
Normal |
Bug report |
5.3.x-dev |
Code |
|
3 years 6 months |
|
Mobile mode uses incorrect date as default start date |
Active |
Normal |
Bug report |
5.2.4 |
Code |
|
10 months 2 weeks |
|
5.3.0 Release plan |
Active |
Normal |
Plan |
5.3.x-dev |
Miscellaneous |
mingsong |
9 months 11 hours |
|
Wrong Date-Time format prevents saving in View |
Closed (fixed) |
Critical |
Bug report |
5.2.4 |
Code |
|
11 months 3 weeks |
|
Empty calendar when contained in Tab not open by default |
Active |
Major |
Bug report |
5.2.4 |
Code |
|
10 months 2 weeks |
|
Drush 13 compatibility |
Closed (fixed) |
Normal |
Task |
5.2.4 |
Code |
|
11 months 3 weeks |
|
Scrolling the page down on a calendar causes it to jump back to the top |
Closed (works as designed) |
Normal |
Bug report |
5.1.7 |
Code |
|
3 years 9 months |
|
Add new event by double click on calendar don't work with Custom entity |
Needs review |
Normal |
Bug report |
5.2.4 |
Code |
|
1 year 5 days |
|
Porting FullCalendar View to Drupal 11 with Bootstrap 5 Integration |
Needs work |
Normal |
Task |
6.x-dev |
Code |
|
1 year 3 weeks |
|
Entries don't appear when Start date is in a relationship entity |
Closed (won't fix) |
Normal |
Feature request |
5.x-dev |
Code |
|
5 years 6 months |
|
Double click doesn't correct path |
Closed (fixed) |
Normal |
Bug report |
8.x-2.x-dev |
Code |
|
8 years 1 week |
|
custom or no link instead of hardcoded link to entity display |
Active |
Normal |
Feature request |
5.2.4 |
Code |
|
1 year 3 months |
|
Events will not appear in the correct date grid |
Closed (works as designed) |
Normal |
Bug report |
5.1.14 |
Code |
|
1 year 4 months |
|
All events not loading (10 only each time?) |
Active |
Normal |
Bug report |
5.2.3 |
Miscellaneous |
|
1 year 6 months |
|
Fatal ERROR: with drupal 11.1 |
Closed (fixed) |
Critical |
Bug report |
5.2.3 |
Code |
|
1 year 5 months |
|
crashes when used with a table without an entity type |
Active |
Major |
Feature request |
5.2.3 |
Code |
|
1 year 6 months |
|
Daterange fields not added to all-day area |
Needs work |
Normal |
Bug report |
5.x-dev |
Code |
|
3 years 9 months |
|
Premium Version |
Active |
Normal |
Plan |
6.x-dev |
Miscellaneous |
mingsong |
1 year 10 months |
|
Full Calendar View page loading extremely slow |
Closed (won't fix) |
Critical |
Support request |
5.1.13 |
Code |
|
2 years 8 months |
|
The performance makes this module unusable. |
Closed (won't fix) |
Major |
Feature request |
5.1.14 |
Code |
|
1 year 10 months |
|
Drush command to create a calendar view |
Closed (fixed) |
Normal |
Feature request |
5.x-dev |
Code |
mingsong |
1 year 8 months |
|
How to Enable Resize feature |
Closed (works as designed) |
Normal |
Support request |
8.x-4.1 |
Code |
|
1 year 9 months |
|
Remove @file tag docblock |
Closed (fixed) |
Normal |
Task |
8.x-1.x-dev |
Code |
Buvaneshwari.V |
8 years 4 months |
|
Fix dependency declaration |
Closed (fixed) |
Normal |
Task |
8.x-1.x-dev |
Code |
|
8 years 4 months |
|
Typo in UI |
Closed (fixed) |
Normal |
Task |
8.x-2.x-dev |
User interface |
|
8 years 3 months |
|
README missing |
Closed (fixed) |
Minor |
Task |
8.x-2.x-dev |
Documentation |
|
8 years 3 months |
|
Support daterange fields |
Closed (fixed) |
Normal |
Feature request |
8.x-2.x-dev |
Code |
|
8 years 3 months |
|
Duplicates of node with multiple date values |
Closed (outdated) |
Normal |
Support request |
5.1.8 |
User interface |
|
3 years 5 months |
|
Project Browser: Create a logo for Fullcalendar View |
Closed (fixed) |
Normal |
Task |
5.x-dev |
User interface |
|
1 year 11 months |
|
Integration with Search API |
Closed (won't fix) |
Normal |
Feature request |
5.x-dev |
Code |
|
6 years 7 months |
|
Add functionality for all-day events |
Needs work |
Normal |
Feature request |
5.x-dev |
Code |
|
8 years 1 week |
|
Add needed libraries to composer.json to support composer workflow |
Closed (outdated) |
Normal |
Feature request |
5.1.8 |
Code |
|
3 years 5 months |
|
Set border color |
Closed (fixed) |
Normal |
Feature request |
5.x-dev |
User interface |
|
1 year 9 months |
|
FullCalendar View not showing events (but list,grid,table view is showing) |
Closed (works as designed) |
Normal |
Support request |
5.2.1 |
Code |
|
1 year 9 months |
|
Problema de consulta extensa en eventos recurrentes |
Closed (won't fix) |
Normal |
Support request |
5.2.1 |
User interface |
|
1 year 10 months |
|
Title of items in view are rendering with escaped characters |
Closed (fixed) |
Normal |
Bug report |
5.2.0 |
Code |
|
1 year 10 months |
|
Why must fields to add an event be required? |
Closed (works as designed) |
Normal |
Feature request |
5.1.14 |
Code |
|
1 year 9 months |
|
Full day event appears on two calendar days when scheduled the day before Daylight Savings Time change |
Active |
Normal |
Bug report |
5.2.1 |
Code |
|
1 year 9 months |
|
Add event link is broken in template |
Closed (works as designed) |
Normal |
Bug report |
5.x-dev |
Code |
|
4 years 10 months |
|
How to build calendar view from text fields? |
Closed (works as designed) |
Normal |
Support request |
5.1.14 |
Miscellaneous |
|
1 year 10 months |
|
Add option to fetch holidays from Google Calendar |
Closed (fixed) |
Normal |
Feature request |
5.x-dev |
Code |
|
6 years 11 months |